← جميع الحاسبات الهندسية (62)
drainage_networkالمجال: landscape/civilStormwater Drainage Network Accumulation (Rational Method)
Multi-branch catchment runoff accumulation, time-of-concentration routing, and pipe capacity check.
حالة التحقق: تم التحقق · محرك حتمي (مرجع هندسي غير قانوني)
مخطط معاملات الإدخال
| المعامل | إلزامي | النوع / النطاق | الوصف |
|---|---|---|---|
| segments | إلزامي | number | Segments |
| iFixed_mmhr | اختياري | number · [0, 300] | I Fixed Mmhr (mm) |
| idfA | اختياري | number · [0, 20000] | Idf A |
| idfB | اختياري | number · [0, 120] | Idf B |
| fillRatio | اختياري | number · [0.5, 1] | Fill Ratio |
استدعاء REST API
curl -s -X POST https://nexyfab.com/api/eng-chat/action \
-H "Content-Type: application/json" \
-H "Authorization: Bearer $NEXYFAB_API_KEY" \
-d '{
"message": "Run drainage_network with {\"segments\":10}",
"domain": "landscape",
"lang": "ar"
}'حمولة JSON OpenAPI
{
"endpoint": "/api/eng-chat/action",
"method": "POST",
"body": {
"message": "Run drainage_network with {\"segments\":10}",
"domain": "landscape",
"lang": "ar"
}
}حاسبات هندسية ذات صلة
landscape_drainage
Site Stormwater Drainage Check (Rational Method & Manning)
earthwork_grid
Grid Cut-and-Fill Earthwork Volume (Spot Elevation Method)
planting_base
Landscape Planting Soil Depth & Tree Pit Verification
pump_head
Pump Total Dynamic Head (TDH) & Shaft Power
pavement_walk
Pedestrian Walkway Pavement Structure & Joint Spacing
مرجع هندسي حتمي غير قانوني؛ يلزم اعتماد مهندس مرخّص قبل الإنتاج.