psc_girderDomain: bridge/pscPrestressed Concrete (PSC) Girder Stress Check (Transfer & Service)
Top/bottom fiber stress verification at prestress transfer and service load stages including prestress losses.
Validation status: Verified · Deterministic Engine (Non-Statutory Engineering Reference)
Input Parameter Schema
| Parameter | Required | Type / Range | Specification |
|---|---|---|---|
| A_mm2 | Required | number · [0, +∞] | A Mm2 |
| I_mm4 | Required | number · [0, +∞] | I Mm4 |
| yt_mm | Required | number · [0, +∞] | Yt Mm |
| yb_mm | Required | number · [0, +∞] | Yb Mm |
| Pj_kN | Required | number · [0, +∞] | Pj K N |
| e_mm | Required | number · [0, +∞] | E Mm |
| lossImmediate_pct | Optional | number · [0, 20] | Loss Immediate Pct |
| lossTotal_pct | Optional | number · [0, 40] | Loss Total Pct |
| Mo_kNm | Optional | number · [0, +∞] | Mo K Nm |
| Ms_kNm | Optional | number · [0, +∞] | Ms K Nm |
| fck | Required | number · [30, 70] | Fck |
| fci | Optional | number · [20, 60] | Fci |
| compFactor | Optional | number · [0.4, 0.7] | Comp Factor |
| MsSustained_kNm | Optional | number · [0, +∞] | Ms Sustained K Nm |
| tensFactor | Optional | number · [0, 0.63] | Tens Factor |
| camber | Optional | number | Camber |
| tendon | Optional | number | Tendon |
| crackControl | Optional | number | Crack Control |
| crackWidth | Optional | number | Crack Width |
| ultimate | Optional | number | Ultimate |
REST API Invocation
curl -s -X POST https://nexyfab.com/api/eng-chat/action \
-H "Content-Type: application/json" \
-H "Authorization: Bearer $NEXYFAB_API_KEY" \
-d '{
"message": "Run psc_girder with {\"A_mm2\":1,\"I_mm4\":1,\"yt_mm\":1,\"yb_mm\":1}",
"domain": "civil",
"lang": "en"
}'OpenAPI JSON Payload
{
"endpoint": "/api/eng-chat/action",
"method": "POST",
"body": {
"message": "Run psc_girder with {\"A_mm2\":1,\"I_mm4\":1,\"yt_mm\":1,\"yb_mm\":1}",
"domain": "civil",
"lang": "en"
}
}Related Engineering Calculators
Deterministic engineering screening reference (non-statutory). Licensed professional review is required before regulatory or production sign-off.