← All 62 Engineering Calculators
two_way_slabDomain: architecture/slabTwo-Way RC Slab Direct Design Method
Total static factored moment M0 and column-strip / middle-strip positive & negative moment distribution.
Validation status: Verified · Deterministic Engine (Non-Statutory Engineering Reference)
Input Parameter Schema
| Parameter | Required | Type / Range | Specification |
|---|---|---|---|
| l1_m | Required | number · [0, 15] | L1 M |
| l2_m | Required | number · [0, 15] | L2 M |
| ln_m | Required | number · [0, +∞] | Ln M |
| wu_kNm2 | Required | number · [0, +∞] | Wu K Nm2 |
| spanType | Required | enum: interior, end | Span Type — options: interior | end |
| endCase | Optional | enum: unrestrained, beamsAll, flatNoEdgeBeam, flatEdgeBeam, fullyRestrained | End Case — options: unrestrained | beamsAll | flatNoEdgeBeam | flatEdgeBeam | fullyRestrained |
| alphaL2L1 | Optional | number · [0, 5] | Alpha L2L1 |
| betaT | Optional | number · [0, 5] | Beta T |
| nSpans | Optional | integer · [1, +∞] | N Spans |
| liveOverDead | Optional | number · [0, +∞] | Live Over Dead |
REST API Invocation
curl -s -X POST https://nexyfab.com/api/eng-chat/action \
-H "Content-Type: application/json" \
-H "Authorization: Bearer $NEXYFAB_API_KEY" \
-d '{
"message": "Run two_way_slab with {\"l1_m\":1,\"l2_m\":1,\"ln_m\":1,\"wu_kNm2\":1}",
"domain": "architecture",
"lang": "en"
}'OpenAPI JSON Payload
{
"endpoint": "/api/eng-chat/action",
"method": "POST",
"body": {
"message": "Run two_way_slab with {\"l1_m\":1,\"l2_m\":1,\"ln_m\":1,\"wu_kNm2\":1}",
"domain": "architecture",
"lang": "en"
}
}Related Engineering Calculators
wind_simple
Simplified Horizontal Wind Load (Low-Rise Main Frame)
wind_static
Static Wind Load Analysis (Rigid Enclosed Building)
shear_wall
Shear Wall Lateral Stiffness & Load Distribution
coupling_beam
Special Shear Wall Coupling Beam Design
steel_beam
Compact H-Section Steel Beam (Strong-Axis Flexure & LTB)
steel_column
Steel Column Flexural Buckling (AISC / KDS)
Deterministic engineering screening reference (non-statutory). Licensed professional review is required before regulatory or production sign-off.